SupportPartner portalLog in to bisly.cloud

Home / Commercial / Schools

Fresh air in every classroom. 20-35% less energy.

Ventilation steps up as a class comes in, and heating follows the school day and the holidays. More than 30 schools and public buildings already run on Bisly and save 20-35% energy. The facility team runs several schools from one BMS, which often flags a fault before a teacher reports it.

Less energy. One platform. 30-40% lower cost. ROI in under 3 years.

Energy savings first

Heating, fresh air and light follow the timetable and the school holidays instead of running all day. More than 30 schools and public buildings on Bisly save 20-35% energy, and CO₂-led ventilation cut ventilation energy by about 40% in a Tallinn school pilot.

One platform, one responsible provider

No stack of software and hardware suppliers to coordinate, and one party answerable for the result.

30-40% lower cost of acquisition

Optimised devices and a deployment configured in the digital twin take the engineering hours out of the project, so the building gets a complete system for less.

ROI in under 3 years

The energy saved pays the system back in under 3 years, and regulation now requires building automation anyway.

Non-residential buildings with heating or cooling above 290 kW have needed building automation since 31 December 2024. By 31 December 2029 the threshold drops to 70 kW (Germany: GModG; elsewhere in the EU: EPBD).

The rules a classroom has to meet, met automatically

Lighting, fresh air and temperature in a classroom are set by standards and national rules. Bisly configures each room type to them once in the digital twin, holds them automatically and keeps the trend data that shows they were met.

What the rule asksWhat Bisly does
Light for younger pupilsEN 12464-1, lighting of indoor workplaces (EVS-EN 12464-1 in Estonia): 300 lx maintained illuminance in classrooms, with dimmable lightingClassroom room type set to 300 lx; DALI-2 presence and lux sensors hold it at the desks and add only what daylight does not give
Light for older pupils and adultsEN 12464-1: 500 lx in classrooms for evening classes and adult educationUpper-school, evening and adult-education rooms set to 500 lx; the level can change by timetable, so one room serves both
Fresh airEstonia, Government Regulation No. 52 (7 July 2025): CO₂ in classrooms on average up to 1,000 ppmVentilation follows CO₂ in every classroom and keeps it under the limit; the trend shows each lesson
TemperatureEstonia, Regulation No. 52: at least 19 °C in classrooms and 18 °C in the gym; no lessons above 27 °CEach room holds its own temperature; Adam flags rooms that drift out of range before the first lesson

Lux levels per room type are configured with the lighting designer at design stage. Other countries set their own indoor-climate rules for schools; we map them in the specification.

Solutions that fit schools

Room automation

Each classroom keeps its own temperature, fresh air and light, following the school day and whether a class is in the room. Nobody has to open a window mid-lesson or turn the heating down after the last bell.

Explore room automation

Energy monitoring

Heat, water and electricity meters are read remotely, so the property manager can see where the energy budget goes, school by school and month by month.

Explore energy monitoring

BMS for the facility team

The heating plant, air handling units, classrooms, lighting and sports hall of every school on one screen. The facility manager has one system to learn, Adam flags faults before a teacher reports them, and the next school is set up the same way.

Explore the BMS

Classroom light that follows the daylight and the timetable

Bisly controls classroom lighting over DALI-2 where the luminaires are addressable and with TRIAC dimmers where they are not. Daylight harvesting measures the light at the desks, dims the rows by the windows on bright days and adds only what daylight does not give, so each classroom holds 300 lx or 500 lx all day. Empty classrooms and corridors switch off by themselves: presence sensors alone save 40-46% of the lighting energy in a classroom.

DALI-2 lighting

  • Bisly DALI Bridge 2 (LD02): one DALI-2 line of 64 luminaires per bridge
  • Presence and daylight sensors on the same line, high-bay sensors for the sports hall
  • Existing wall switches become DALI-2 inputs
  • Light levels and scenes per room type and timetable

TRIAC lighting

  • UM6D dimmer: 6 channels of 240 W each, in the switchboard
  • UMD dimmer: 2 channels of 220 W, behind the wall switch
  • UMS Supersensor, in black or white: presence (PIR as standard, radar as an option), light level and colour temperature, plus CO₂, VOC, humidity and temperature
  • Leading or trailing edge, set in software
Bisly DALI Bridge 2 (LD02)Bisly Presence Sensor (SP01)Bisly DALI Input 4 (LI04)
Bisly UM6D 6-channel dimmer
Bisly UMD 2-channel dimmer
Bisly UMS Supersensor

Bisly has two device portfolios, and both run heating, ventilation and lighting: wired devices in a new school, Bisly Wireless where a retrofit should not open the ceilings. Either way, one sensor and one BMS run the whole classroom.

What classrooms get and what the facility team sees

Classroom temperatures are controlled automatically, and teachers can adjust them within set limits. The facility team runs the whole school from the BMS, with functions designed to EN ISO 52120-1: class B as standard, class A where you need it. Click a function to see it.

Heating

Each classroom holds its own temperature, and heating pauses when a window opens. Teachers can change the temperature within limits the facility manager sets, and the room returns to its schedule on its own. The dashboard flags rooms that drift from their set temperature, so a cold classroom is easy to find.

What it does and what it pays back

20-35%

energy savings across 30+ schools and public buildings on Bisly

~40%

less ventilation energy when airflow follows CO₂ instead of running at full power.

Under 3 years

return on investment

Seconds

from an out-of-range reading to an alarm on the facility manager's phone.

Planning a new school?

Tell us about the school and how it is used. After a 30-minute call, you get the scope and a fixed price within 5 working days. For your tender, we also send the EN ISO 52120-1 function table, datapoint lists and specification text.