SupportPartner portalLog in to bisly.cloud

Home / Resources / Funding by country

Funding for building automation, market by market

Which grants, loans and tax rules pay for room control, hydronic balancing, metering and building automation in Estonia, Latvia, Lithuania, Germany and Poland, for new build and renovation, and what each market requires anyway. Pick a country.

Status 6 October 2026. Every programme links to its source.

Show programmes for

Apartment renovation at a glance

Is the work required, funded or neither in the main apartment-renovation programme?

MarketHydronic balancingThermostatic valves and room controlIndividual heat meteringAutomation and BMS
EstoniaRequired: balancing protocol at payoutRequired: per-apartment regulation and valves for 18-23 °CNot required; separate metering in the substationNot required; heat-recovery ventilation required
LatviaNot statedNot itemisedFunded, and remote-readable by 1 Jan 2027Functions defined in the minimum requirements (MK 222)
LithuaniaFunded under the small renovation scheme (no new call planned)Funded under the small renovation scheme (no new call planned)Funded under the small renovation scheme (no new call planned)Rewarded: automated substations and heating modernisation
GermanyFunded; required for heating optimisationFunded: automated valves, room controllers, electronic thermostatsFunded: electronic allocators and heat metersFunded: energy management and software licences up to 10 years
PolandPart of eligible heating modernisationNot itemisedRemote-readable from 1 Jan 2027SCADA and metering funded for public buildings

Estonia

The apartment reconstruction grant makes room-level control and a balanced heating system a condition of payment. Per-apartment heat allocation is not required, but the control it relies on is. Apartment grants move from EIS to KIK in early 2027.

ProgrammeWho appliesSupportWhat it covers for automation and heatingStatusSource
Korterelamute rekonstrueerimistoetus (apartment building reconstruction grant), EISApartment associations; buildings from before 2000 with 3 or more apartments30% in Tallinn and Tartu, 40% in regional centres, 50% elsewhere; bonuses up to 55%Required: heating regulated at least per apartment, thermostatic valves with limiters for 18-23 °C, heat-recovery ventilation (at least 70%), separate metering in the substation, balancing protocol at payout. Eligible: heating renewal and balancing, substation, solarThird round decided 13 Apr 2026 (154 buildings); no 2026 round announced; projects finish by 31 Dec 2027eis.ee
Määrus nr 13 (3 March 2023), grant conditionsAll grant applicantsLegal basis§14: technical requirements quoted above; §31: balancing protocol even where the heating was renewed earlierIn forceriigiteataja.ee
Korterelamu renoveerimislaen (renovation loan), EISAssociations refused by 2 banksFrom 2% plus 6-month Euribor, €15,000 to €3M, up to 30 yearsThe same works as the grantOpeneis.ee
Korterelamulaenu käendus (renovation loan guarantee), EISAssociations borrowing from banksState guaranteeThe same worksOngoing; stays with EIS after 2027adaur.ee
Large municipal buildings, energy-efficient reconstruction (RTK)Municipalities: schools, culture, sports and care buildings€38M; 50-70%; up to €5.88M per projectHeating, ventilation and renewable upgradesAnnounced 9 Mar 2026riigiteataja.ee

Building automation duty: existing non-residential buildings with heating or cooling above 290 kW must have building automation where technically and economically feasible. The EPBD 2024 rules were due in national law by 29 May 2026.

Latvia

Latvia funds individual heat metering in its apartment programme and requires every heat meter and allocator to be remote-readable from 1 January 2027. Its minimum-requirements rule also defines what building automation must do: open protocols, independence from any one manufacturer, and monitoring of temperature, humidity and CO₂.

ProgrammeWho appliesSupportWhat it covers for automation and heatingStatusSource
Daudzdzīvokļu māju energoefektivitāte 2021-2027 (multi-apartment energy efficiency, ERDF), ALTUMApartment owners through an authorised person; 3 or more apartments40% grant, 45-50% in some cases, up to €300,000 per building; ALTUM loan up to €7M or an 80% guaranteeRenewal of building services, "including individual heat metering"; solar for own useGeneral funds reached their limit on 2 Sep 2026; new applications paused; works finish by 31 Mar 2029altum.lv
MK 880 (17 Dec 2024), programme rulesProgramme applicantsLegal basisPoint 28.3: building services, including individual heat meteringIn forcelikumi.lv
Business greening loan with capital rebate, ALTUMSMEs; Riga and large companies from 16 Nov 2026Loan up to €10M, rebate up to 30%Building energy efficiency and energy management systemsOpen in the regions; Riga opens 16 Nov 2026altum.lv
MK 222, minimum energy-efficiency requirements (amended 25 Aug 2026)Apartment and non-residential buildingsObligation, not fundingRemote-readable heat meters or allocators by 1 Jan 2027; building automation that monitors, logs and adjusts energy use, uses open protocols and monitors temperature, humidity and CO₂In force; related duties from 31 Dec 2027 (above 290 kW) and 31 Dec 2029 (above 70 kW)likumi.lv

Building automation duty: defined in MK 222 for systems above 290 kW from 31 December 2027 and above 70 kW from 31 December 2029.

Lithuania

Lithuania's next apartment modernisation call, planned for late October 2026, pays extra for modernising the substation and the heating system. The small renovation scheme for heating systems funded thermostatic valves and automated substations, but has no new call planned.

ProgrammeWho appliesSupportWhat it covers for automation and heatingStatusSource
Daugiabučių namų atnaujinimas, 14th call (multi-apartment modernisation, Cohesion Fund), APVAApartment owners through administrators or associations€259M for about 640 projects; base 15-25% by municipality; +5 points each for substation and heating modernisation, municipal guidelines and panel renovation (up to about 40%); loans up to 20 yearsClass B and at least 40% less heat; heating modernisation rewardedPlanned for late Oct 2026apva.lrv.lt
Mažoji renovacija (small renovation of heating and hot water), APVAAdministrators, heat suppliers and owners; buildings from before 1993Up to 60%; +10 points for automated substations; 100% for low-income residentsHeating system rebuild, including thermostatic valves and radiators; balancing and individual meteringLast call closed 23 Jul 2025; not in the October 2026 planapva.lrv.lt
Municipal public buildings, phase IV, APVAMunicipalities; buildings over 250 m²€72M, up to 50%Class B or better and 30% less primary energyPlanned Q4 2026am.lrv.lt
Central government buildings, APVAState institutions€68MBuilding renovationPlanned Q4 2026apva.lrv.lt

Building automation duty: non-residential buildings with heating, ventilation or cooling above 290 kW need automatic control from 1 January 2025 where feasible (STR 2.09.02:2005).

Germany

Germany has the most detailed lists of what counts. "Efficiency Smart Home" funds electronic thermostats, allocators, energy management and wireless installations in apartment buildings of any size; heating optimisation is limited to buildings with up to 5 units.

ProgrammeWho appliesSupportWhat it covers for automation and heatingStatusSource
BEG EM, building systems, residential: "Efficiency Smart Home", BAFAOwners, condominium associations (WEG), housing companies, contractors15%, plus 5% with a renovation roadmap (iSFP); eligible-cost caps per unitSmart meters and controls for heating, lighting and ventilation; electronic allocators and heat meters; electronic radiator and room thermostats; air-quality, window and presence sensors; wireless installations; energy management with licences for up to 10 years; heating-curve optimisationOpenbafa.de
BEG EM, building systems, non-residential, BAFACompanies, municipalities, non-profits15%Building automation of at least class B (DIN V 18599-11): demand-based HVAC, room-by-room heating control, energy management, meteringOpenbafa.de
BEG EM, Heizungsoptimierung (heating optimisation), BAFAOwners15%, plus 5% with iSFPHydronic balancing including the heating curve, pre-settable or automated thermostatic valves, single-room controllers, differential-pressure valvesOpen; only residential buildings with up to 5 units and non-residential up to 1,000 m²bafa.de
KfW 458, heating grantOwners, WEG, housing companies30% base, with bonuses up to 70%Related works with a new heat generator: sensors, digital thermostats, BMS and energy management, hydronic balancing, automated valvesOpenkfw.de
KfW 261, whole-building retrofit loanOwners, WEG, housing companiesLoan up to €150,000 per unit, with a repayment grant by efficiency levelAll building systems including controls, as part of the retrofitOpenkfw.de
KfW 297/298, climate-friendly new buildBuilders, buyers, housing companiesLoan up to €100,000 per unit (€150,000 with QNG)New build to Efficiency House 40Open; the EH55 option ends 31 Dec 2026 at the latestkfw.de
§35c EStG, income tax reductionOwner-occupiers; buildings over 10 years old20% over 3 years, up to €40,000Digital systems for optimising operation and consumption; optimising existing heatingIn forcedejure.org

Building automation duty: GEG §71a required building automation in non-residential buildings above 290 kW by 31 December 2024. The Gebäudemodernisierungsgesetz, published 28 July 2026, brings the EPBD building-automation rules in from about February 2027, with the threshold falling to 70 kW by 2029.

Poland

For apartment blocks Poland works through loans with a premium rather than grants. Direct grants target single-family houses and small communities, and FEnIKS funds SCADA and metering in public buildings. Heat metering in multi-family buildings must be remote-readable from 1 January 2027.

ProgrammeWho appliesSupportWhat it covers for automation and heatingStatusSource
Premia termomodernizacyjna (thermomodernisation premium), BGK through banksHousing communities and cooperatives, municipalities, owners26% of the loan, 31% with renewables; energy audit requiredHeating and hot-water modernisation, district-heating connection, renewables; heating-only projects need at least 10% less heat demandOngoingbgk.pl
Grant termomodernizacyjny (add-on grant), BGKAs above+10 points (36%, 41% with renewables)Primary energy and insulation standardsDeadline 30 Jun 2026; extension not confirmedgov.pl
Ciepłe Mieszkanie (Warm Apartment), NFOŚiGW through municipalitiesApartment owners; communities of 3-7 units30-90% for individuals; up to 60% for communitiesHeat source, heat-recovery ventilation, windows, solar for communitiesUntil 31 Dec 2026gov.pl
Czyste Powietrze (Clean Air), NFOŚiGWSingle-family house ownersUp to 40-100% by incomeHeat source, heat-recovery ventilation, heating installationOpen; reformed from 20 Jul 2026czystepowietrze.gov.pl
Moje Ciepło (My Heat), NFOŚiGWOwners of new single-family houses30%, 45% for large familiesHeat pumpsUntil 31 Dec 2026 or until funds run outmojecieplo.gov.pl
FEnIKS, energy efficiency in public buildings, NFOŚiGWLocal authorities, municipal companies, hospitals, universitiesGrants and loansSCADA and metering, heating, ventilation, solarSeveral calls openfeniks.gov.pl

Building automation duty: non-residential buildings with heating or HVAC above 290 kW needed building automation by 31 December 2024 where justified (act of 7 October 2022).

What this means for your project

Renovating an apartment building

Room control, balancing or remote metering is required or funded in every market above. Bisly Wireless installs all three in about 30 minutes per apartment.

Wireless retrofit for apartment buildings

Building new

Few markets fund automation in new build, but the remote-metering rules and the EPBD apply from day one. Bisly Home packages meet them at no added cost.

Smart apartment packages

Commercial and public buildings

Above 290 kW building automation is already required in most markets, and the threshold falls to 70 kW by 2029.